Drone footage of the Swiss Life Arena construction site

21.05.2021 | Zurich

ZSC Stadion Altstetten R Dürr 2
ZSC Stadion Altstetten R Dürr 1

New drone images of the Swiss Life Arena construction site show the current status: The base construction is already well advanced. The building construction has reached its final height in the south and north, and the facades are also already clearly visible. Pre-assembly of the steel roof has begun. The construction of the utility lines, the interior fittings and the installation of the building services are in full swing.