Unterhörstetten
New construction of a production hall as an extension of the existing production towards the south. In E-2, a parking garage will be built in solid construction. E-1 will be partly built in solid and prefabricated concrete construction, from E0 a steel construction will be built. This will be clad with sandwich panels. A PV system will be installed on the roof. Office building in timber construction
Plazza AG, Zürich
Total company with full cost, quality and schedule guarantee
Beat Oberhänsli Architektur AG, Bottighofen
Volume - production 27'760 m³
Volume - office building 7'720 m²
Main floor space - production 3'600 m²
Main floor space - office building 1'530 m²
Floor area - production 5'730 m²
Floor area - office building 2'090 m²
Parking 1'880 m²
CHF 14.5 Mio.
October 2022 - February 2024
HRS Real Estate AG