Frauenfeld
The Frauenfeld Parcel Distribution Center is one of Switzerland’s major logistics projects and serves as a central hub for national parcel processing. With its large capacity and state-of-the-art logistics infrastructure, the facility provides the foundation for the efficient, reliable, and future-oriented handling of goods and parcel flows.
The building complex combines loading stations, sorting and operational areas, workshops, office spaces, staff rooms, and extensive outdoor facilities into a high-performance comprehensive solution. The architecture and infrastructure were consistently designed to ensure optimal operational processes, short distances, and maximum efficiency. In this way, the center makes an important contribution to ensuring an efficient logistics supply chain in Switzerland.
As the general contractor, HRS was responsible for the project’s execution with a full guarantee of cost, quality, and schedule. The demanding coordination of construction, logistics, and technical systems required precise planning and close collaboration among all project participants. The result is a pioneering logistics center that continues to meet the highest standards of performance, functionality, and cost-effectiveness to this day.
Post Office Real Estate Management and Services AG, Berne
General contractor with full cost, quality and deadline guarantee, coordination of logistics, construction and plants.
Muller + Partner Architektur AG, Sulgen
CHF 50 million
July 1997 – November 1998
HRS Real Estate AG
Walzmühlestrasse 48
8501 Frauenfeld
+41 58 122 85 00
frauenfeld@hrs.ch