ZIAP La Pallanterie P9
Meinier
Development comprising the construction of a multi-purpose building of an industrial and artisanal nature. The building is approximately 36 x 44 x 15 metres and has two basement levels, a ground floor, a mezzanine above the ground floor, a first floor and an attic. The two basement levels are intended for parking for approximately 134 passenger and/or commercial vehicles and 39 two-wheelers. The machine rooms will be located in the first basement. “Bulk” delivery of the surfaces for rent.
Information
Client
La Fondation Intercommunale des Terrains Industriels et Artisanaux de la Pallanterie, Vesenaz
Services rendered by HRS
Prime contractor with cost, quality and deadline guarantee, open book management with shared savings
Architect
Studio Project Sàrl, Geneva
Dimensions
Built-up area 44,971 m3
Floor area 12,780 m2 Construction
costs
CHF ~ 17.8 million
Construction time
February 2017 - July 2018